Time Study / Work Measurement enables your
organization to
- Improve output, utilization, and cycle times
- Optimize staffing levels, balance assignments, manage constraints
- Identify non-value added activity
- Create objective cost definition and control
- Lay the groundwork for incentives if desired
Facility
Layout will
-
Match today's mission to the space, in existing or new facilities
- Design efficient flow patterns for product and people
- Fit equipment, processes and people into the property
- Improve floor space utilization
Relocate, merge or consolidate operations
- Position facilities to access people or resources
-
Take advantage of site-sensitive costs or aid customer service.
- Integrate acquired or merged operations and facilities for efficiencies, utilization and economies of scale.
- Maximize business criteria and / or
quality of life factors.
Balance workloads of people and processes
- To reach optimum, sustainable levels of output
- To cut lost time
- To resolve conflict, objectively
Optimize Capacity, up or down as sales vary
- Adjust operations to respond to demand efficiently.
- Identify and manage constraints for lower inventory, faster reaction and shorter cycle times.
Reduce Cost / Improve Productivity
In November 2009, the Bureau of Labor Statistics announced that US non-farm productivity surged at a 9.5% annual rate. It
can be done. But it takes work-- and experience helps.
What's Next
If you need to correct a particular productivity problem, or update ineffective practices,
or put productivity techniques into effect for the first time,
Click Here
to inquire how IE and productivity principles can contribute to your situation and intentions.
JPR provides another pair of objective eyes to understand the challenge, another set of experienced hands to
implement an effective solution.
We'll be glad to discuss your circumstances as well
at 626-375-2468.
Either way, there is no cost or obligation.